What it is
Conditioned material is allowed or forced to flow through the method’s specified arrangement.
SANAS T1018
Public test guide
Assesses the flow or consistency behaviour of a bitumen-rubber blend under a controlled test condition.
Plain-language explanation
The project specification controls the exact method and acceptance requirement.
Conditioned material is allowed or forced to flow through the method’s specified arrangement.
Prepared blend, controlled-temperature bath or chamber and specified flow apparatus.
A flow time, distance or method-specific consistency result.
Supports production control, application handling and comparison of bitumen-rubber blends.
Typical test sequence
Prepare and condition the blend
Initiate flow under the specified condition
Record the endpoint and report the flow result
Request this service